NLC SETUP CHECKLIST
-
Trailer
-
Unload Trailer
-
Stage Fixtures
-
Close Trailer
-
Place On Stage Lighting Fixtures
-
Power to On Stage Light Fixtures
-
Blue Cable Spool (Stage Lights)
-
Aim Beam Lights
-
Audio
-
Set Sound Board on Table
-
Place Subs and Tops
-
Power to Subs and Tops
-
Green Cable Spool (Audio)
-
Cat 5 Cable Spool (Brain to Board)
-
Projection
-
Raise Projection Screens
-
Place and Power Projectors
-
Aim Projectors
-
Red Coax Cable (Board Decimator [Red Box] to Stage Decimator [Red Box])
-
Par Lighting (Z100’s)
-
Setup and Place Par Lights
-
Power to Par Lights
-
Pink Cable Spool (Par Lights)
-
Aim Par Lights
-
Jesse
-
Place and Fill Hazers (Jesse)
-
Power to Hazers (Jesse)
-
Set Up Sound Board Table Connections (Jesse)
-
Program Lighting (Jesse)
-
Final Touches
-
Set Up TV
-
Cable Covers (On Stage)
-
Door Lock Bar
-
Cable Covers (Off Stage)
-
Slide Sound Board Tables Forward
-
Close Curtain
-
As Time Allows
-
Add New Bins and Label Appropriately (See Lianne)