NLC SETUP CHECKLIST

  • Trailer

  • Unload Trailer

  • Stage Fixtures

  • Close Trailer

  • Place On Stage Lighting Fixtures

  • Power to On Stage Light Fixtures

  • Blue Cable Spool (Stage Lights)

  • Aim Beam Lights

  • Audio

  • Set Sound Board on Table

  • Place Subs and Tops

  • Power to Subs and Tops

  • Green Cable Spool (Audio)

  • Cat 5 Cable Spool (Brain to Board)

  • Projection

  • Raise Projection Screens

  • Place and Power Projectors

  • Aim Projectors

  • Red Coax Cable (Board Decimator [Red Box] to Stage Decimator [Red Box])

  • Par Lighting (Z100’s)

  • Setup and Place Par Lights

  • Power to Par Lights

  • Pink Cable Spool (Par Lights)

  • Aim Par Lights

  • Jesse

  • Place and Fill Hazers (Jesse)

  • Power to Hazers (Jesse)

  • Set Up Sound Board Table Connections (Jesse)

  • Program Lighting (Jesse)

  • Final Touches

  • Set Up TV

  • Cable Covers (On Stage)

  • Door Lock Bar

  • Cable Covers (Off Stage)

  • Slide Sound Board Tables Forward

  • Close Curtain

  • As Time Allows

  • Add New Bins and Label Appropriately (See Lianne)

This checklist was created by jesse pierce

copy saved

copies saved